Rānui Solar Farm goes live!

Rānui Solar Farm is now in its final testing phase and is generating up to 9.9 MW (9900 kW) of renewable energy. You can follow the generation in real time here! The project went very well, although last year’s wet Read more

By admin, 2 monthsApril 12, 2026 ago
Uncategorized

Looking ahead to 2026

December 2025 Work in the past couple of months at Rānui has included building the control panels which control the solar farm, finalising protection equipment and waiting for engineering studies. The independent engineering consultants will provide settings which will be Read more

By admin, 6 monthsDecember 5, 2025 ago
Uncategorized

The lawnmowers have arrived!

A flock of about 150 sheep are happily keeping the grass down at Rānui Solar Farm and enjoying the benefits of shade and shelter from the solar panels. Agrivoltaics, or, when applied to sheep, more evocatively known as solar grazing, Read more

By admin, 8 monthsSeptember 25, 2025 ago
Uncategorized

We’re in the news!

Last week, some enthusiastic young environmentalists (school students) along with other volunteers began planting native trees on the border between Rānui Solar Farm and the Whale (cycle) Trail. The Marlborough Weekly covered it and discovered how a cycle trail+native trees+ Read more

By admin, 8 monthsSeptember 25, 2025 ago
Uncategorized

Commissioning begins

Rānui Solar Farm’s main contractor, K&T Construction, has now left the site after seven months, as all of the work associated with the panels and DC wiring is now complete. They have done a fantastic job and have been friendly, Read more

By admin, 8 monthsSeptember 24, 2025 ago
Uncategorized

August update

One of the inverters is craned into place at Rānui. The installation of three 14 tonne inverters at Rānui Solar Farm in mid-August marked a significant milestone for the project, with much of the major work now completed. The inverters Read more

By admin, 10 monthsAugust 14, 2025 ago
Project Updates

23 May – Mechanical Installation Complete

The mechanical installation is now complete. 10760 piles, 736 Tables, 20608 Panels, 100000 nuts and bolts. Awesome work by K&T Construction.

By admin, 1 yearMay 24, 2025 ago
Project Updates

12 May – Tables, Trenches, Panels

The last few weeks have seen good progress. The piling is complete, 70% of the girders/purlins have been installed, 60% of the panels are in place and most of the trenching has been completed. This video shows work carried out Read more

By admin, 1 yearMay 11, 2025 ago
Project Updates

24 April – Piling

Good progress has been made with the piling nearly done, 30% of the framing complete and 10% of the panels installed. The time lapse video below shows the first stages of building the solar farm, putting the piles in, then Read more

By admin, 1 yearApril 24, 2025 ago
Project Updates

4 April : First Row of Solar Panels

This week saw the construction of the ‘Golden Row’, the first row of solar panels which is used as a blueprint for the rest of the construction and quality control of the solar farm.  Surveying for pile positions and pile Read more