Looking ahead to 2026
December 2025 Work in the past couple of months at Rānui has included building the control panels which control the solar farm, finalising protection equipment and waiting for engineering studies. The independent engineering consultants will provide settings which will be programmed to ensure the scheme will integrate well into Marlborough Read more…
